TxDOT letting · upcoming
TxDOT Letting A002-15-207 — Feasibility Study, Nacogdoches County
Feasibility Study for upgrading US 59 to Interstate Standards.
Estimated letting
August 4, 2028
Project estimate (TxDOT)
$2,000,000
| Type of work | Feasibility Study |
|---|---|
| Location | Nacogdoches County · Lufkin District · US 59 |
| DBE goal | 0.0% |
| CCSJ | A002-15-207 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Nacogdoches County
- 0059-04-053 — Resurface Roadway
- 0059-05-046 — Resurface Roadway
- 0059-05-048 — Resurface Roadway
- 0109-06-047 — Bridge Maintenance
- 0118-06-071 — Bridge Replacement
- 0118-08-085 — Bridge Replacement