TxDOT letting · upcoming
TxDOT Letting A002-12-354 — Engineering Design/Study, Dallas County
This feasibility study is to assess the corridor for safety improvements.
Estimated letting
December 4, 2027
Project estimate (TxDOT)
$20,000,000
| Type of work | Engineering Design/Study |
|---|---|
| Location | Dallas County · Dallas District · SL 12 |
| DBE goal | 0.0% |
| CCSJ | A002-12-354 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Dallas County
- 0008-08-078 — Reconstruct Existing Roadway
- 0008-08-079 — Intersection Improvement
- 0008-08-081 — Rehabilitate Existing Roadway
- 0008-08-082 — Rehabilitate Existing Roadway
- 0008-08-083 — Bridge Maintenance
- 0008-08-085 — Rehabilitate Existing Roadway