TxDOT letting · upcoming
TxDOT Letting A001-90-744 — Feasibility Study, Dallas County
Develop alternatives on SL 12 with pedestrian land bridge, reconfigure Lemmon Avenue interchange including a new connection to Shorecrest Drive, and options for interchange at Harry Hines/SS 482, and add connections to I35E and Raceway interchange.
Estimated letting
December 4, 2027
Project estimate (TxDOT)
$2,500,000
| Type of work | Feasibility Study |
|---|---|
| Location | Dallas County · Dallas District · SL 12 · Dallas |
| DBE goal | 0.0% |
| CCSJ | A001-90-744 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Dallas County
- 0008-08-078 — Reconstruct Existing Roadway
- 0008-08-079 — Intersection Improvement
- 0008-08-081 — Rehabilitate Existing Roadway
- 0008-08-082 — Rehabilitate Existing Roadway
- 0008-08-083 — Bridge Maintenance
- 0008-08-085 — Rehabilitate Existing Roadway