TxDOT letting · upcoming
TxDOT Letting 1283-01-012 — Bicycle And Pedestrian Improvements, Presidio County
Construct sidewalk along FM1112 from Highland to B street and Bike/Ped bridge over Alamito Creek extending 2 blocks past bridge to connect to existing TxDOT shared use path.
Estimated letting
May 5, 2027
Project estimate (TxDOT)
$1,281,294
| Type of work | Bicycle And Pedestrian Improvements |
|---|---|
| Location | Presidio County · El Paso District · FM 1112 · Marfa |
| DBE goal | 0.0% |
| CCSJ | 1283-01-012 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Presidio County
- 0003-03-051 — Resurface Roadway
- 0104-07-027 — Preventive Maintenance
- 0924-07-024 — State Park Improvements
- 6513-59-001 — METAL BEAM GUARD FENCE REPAIR