TxDOT Letting 0924-06-566 — Traffic Management Center Upgrade, El Paso County
TMCU Phase2 Construction: The project includes the upgrade of the City of the El Paso TMC & Traffic Signal controller equipment city wide. PH 1 Design Phase PH 2-5 are the implementation & construction of the design.
Estimated letting
October 21, 2026
Sum of project estimates (2 projects)
$8,669,976
| Type of work | Traffic Management Center Upgrade |
|---|---|
| Location | El Paso County · El Paso District · Various |
| DBE goal | 0.0% |
| CCSJ | 0924-06-566 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in El Paso County
- 0001-01-075 — Hazard Elimination & Safety
- 0001-01-077 — Install Traffic Signal
- 0001-02-080 — Hazard Elimination & Safety
- 0001-03-062 — Railroad Crossing Improvements
- 0001-04-104 — Resurface Roadway
- 0001-04-105 — Resurface Roadway