TxDOT letting · upcoming
TxDOT Letting 0915-20-023 — Construct Pedestrian Infrastructure, Uvalde County
Construct Sidewalk on Garden St. from Grove St. to Farrar St, Juarez St. from Grove St. to Elizabeth St, Cargile St. from FM 1435 to Doolie St, Farrar St. from Juarez St. to Vanessa St. Includes ADA Ramps, Crosswalks, and Signage
Estimated letting
December 4, 2028
Project estimate (TxDOT)
$3,273,480
| Type of work | Construct Pedestrian Infrastructure |
|---|---|
| Location | Uvalde County · San Antonio District · Various · Uvalde |
| DBE goal | 0.0% |
| CCSJ | 0915-20-023 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list