TxDOT Letting 0912-73-254 — Bicycle And Pedestrian Improvements, Galveston County
Design and Construct sidewalk on SH 275 (Harborside Dr) from 29th St to Term 28, Stripe walkway on New Strand St from 25th to 28th, Install APS at various intersections on SH 275, Signal at 29th, Modify signal & pedestrian crossings at SH 275 & 25th
| Type of work | Bicycle And Pedestrian Improvements |
|---|---|
| Location | Galveston County · Houston District · Various · Galveston |
| Estimated letting | 2028-06-15 00:00:00+00:00 |
| Construction estimate | $2,684,240 |
| DBE goal | 0.0% |
Other lettings in Galveston County
- 0051-03-123 — Surfacing/Roadway Restoration
- 0051-08-020 — Surfacing/Roadway Restoration
- 0051-09-127 — Construct Pedestrian Infrastructure
- 0192-04-110 — Surfacing/Roadway Restoration
- 0192-04-112 — Construct Pedestrian Infrastructure
- 0192-04-113 — Surfacing/Roadway Restoration