TxDOT letting · upcoming
TxDOT Letting 0909-36-175 — Construct New Road, Bell County
Widen Chaparral Rd between Trimmier Rd and E Trimmier Rd from 2 lanes to 4 lanes with a continous center turn lane. Add 8 ft bicycle lane and 5 ft sidewalk or Shared Use Path on both sides of the road.
Estimated letting
July 2, 2028
Project estimate (TxDOT)
$32,880,000
| Type of work | Construct New Road |
|---|---|
| Location | Bell County · Waco District · CHAPARRAL RD · NA |
| DBE goal | 0.0% |
| CCSJ | 0909-36-175 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Bell County
- 0014-06-047 — Bridge Maintenance
- 0014-07-112 — Bridge Maintenance
- 0015-01-248 — Seal Coat
- 0015-04-092 — Intersection Improvements With Right And/Or Left T
- 0015-04-093 — Construct Pedestrian Infrastructure
- 0015-05-052 — Rehabilitate Existing Roadway