TxDOT letting · upcoming
TxDOT Letting 0902-90-402 — Traffic Signal Improvements, Tarrant County
HSIP project to improve traffic signal, Install Flashing Yellow arrow, Positive offset left turn lane, install pedestrian countdown timer and safety lighting.
Estimated letting
June 1, 2029
Project estimate (TxDOT)
$1,183,505
| Type of work | Traffic Signal Improvements |
|---|---|
| Location | Tarrant County · Fort Worth District · W NORTHSIDE · Fort Worth |
| DBE goal | 0.0% |
| CCSJ | 0902-90-402 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Tarrant County
- 0008-05-029 — Reconstruct Existing Roadway
- 0008-06-054 — Rehabilitate Existing Roadway
- 0008-06-055 — Rehabilitate Existing Roadway
- 0008-07-034 — Construct Pedestrian Infrastructure
- 0008-12-101 — Transportation Service Operations
- 0008-12-102 — Transportation Service Operations