TxDOT letting · upcoming
TxDOT Letting 0902-90-388 — Bridge Replacement, Tarrant County
RECONSTRUCT 2 LANE TO 2 LANE BRIDGE
Estimated letting
August 1, 2027
Project estimate (TxDOT)
$3,900,000
| Type of work | Bridge Replacement |
|---|---|
| Location | Tarrant County · Fort Worth District · BEDFORD · Colleyville |
| DBE goal | 0.0% |
| CCSJ | 0902-90-388 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Tarrant County
- 0008-05-029 — Reconstruct Existing Roadway
- 0008-06-054 — Rehabilitate Existing Roadway
- 0008-06-055 — Rehabilitate Existing Roadway
- 0008-07-034 — Construct Pedestrian Infrastructure
- 0008-12-101 — Transportation Service Operations
- 0008-12-102 — Transportation Service Operations