TxDOT letting · upcoming
TxDOT Letting 0619-03-070 — Traffic Signal Improvements, Collin County
TURN LANES & TRAFFIC SIGNAL INSTALLATION AT FM 544 AT H.E.B. DRIVE
Estimated letting
July 3, 2026
Project estimate (TxDOT)
$1,027,827
| Type of work | Traffic Signal Improvements |
|---|---|
| Location | Collin County · Dallas District · FM 544 · Murphy |
| DBE goal | 0.0% |
| CCSJ | 0619-03-070 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Collin County
- 0047-04-032 — RECONSTRUCT & WIDEN 2 LN RURAL HWY TO 4 LN URBAN
- 0047-04-041 — Rehabilitate Existing Roadway
- 0047-04-044 — Rehabilitate Existing Roadway
- 0047-05-061 — Reconstruct Existing Roadway
- 0047-06-178 — Install Fiber Optic Cable ITS
- 0047-06-183 — Repair Roadway