TxDOT letting · upcoming
TxDOT Letting 0177-01-123 — Resurface Roadway, Polk County
Resurface with SP-C (NB/SB Lanes)
Estimated letting
July 1, 2027
Engineer's estimate
$2,071,577
| Type of work | Resurface Roadway |
|---|---|
| Location | Polk County · Lufkin District · US 59 · Livingston |
| DBE goal | 0.0% |
| CCSJ | 0177-01-123 |
Free in GoInfraSight, no account needed
- the plans and proposal files TxDOT has posted
- the contractors who have pulled plans, with how often each wins
- the full bid item list
Other lettings in Polk County
- 0059-05-046 — Resurface Roadway
- 0059-05-048 — Resurface Roadway
- 0176-05-203 — Resurface Roadway
- 0176-05-205 — Intersection Improvement
- 0176-06-015 — Bridge Replacement
- 0176-06-022 — Construct Pedestrian Infrastructure