| Code | Description | Quantity |
|---|
| 422-7002 | REINF CONC SLAB (HPC) | 39,690 SF |
| 161-7002 | COMPOST MANUF TOPSOIL (4") | 29,821 SY |
| 422-7002 | REINF CONC SLAB (HPC) | 28,755 SF |
| 164-7015 | DRILL SEED (TEMP_WARM_COOL) | 25,540 SY |
| 422-7002 | REINF CONC SLAB (HPC) | 23,085 SF |
| 164-7012 | DRILL SEED (PERM_URBAN_CLAY) | 21,259 SY |
| 422-7002 | REINF CONC SLAB (HPC) | 17,640 SF |
| 422-7002 | REINF CONC SLAB (HPC) | 16,879 SF |
| 161-7002 | COMPOST MANUF TOPSOIL (4") | 16,766 SY |
| 662-7068 | WK ZN PAV MRK REMOV (W)6"(SLD) | 16,761 LF |
| 662-7068 | WK ZN PAV MRK REMOV (W)6"(SLD) | 16,003 LF |
| 662-7068 | WK ZN PAV MRK REMOV (W)6"(SLD) | 15,999 LF |